shot-button
Subscription Subscription
Home > Mumbai > Mumbai News > Article > Mumbai lockdown benefits Two more foot over bridges at Andheri station

Mumbai lockdown benefits: Two more foot-over-bridges at Andheri station

Updated on: 03 August,2020 07:06 AM IST  |  Mumbai
Rajendra B Aklekar |

The additions are a result of directives from the railway minister following our reports on lack of Metro-WR integration

Mumbai lockdown benefits: Two more foot-over-bridges at Andheri station

The Andheri FOB (Churchgate-end)

A year after mid-day highlighted the issue of crowding at Ghatkopar station leading to Railway Minister Piyush Goyal giving directives to improve conditions of both Ghatkopar and Andheri stations, the Western Railway (WR) on Sunday announced that it had completed two large six-metre wide bridges at Andheri.


Goyal's directives came after mi-day ran a front-page story on August 30, 2019, seeking local railway officials' attention to improve and decongest Ghatkopar and Andheri stations, which share a common interface with Mumbai Metro Line 1. Apart from two FOBs at Andheri, WR also announced the completion of one more FOB at Marin Lines station, one skywalk at Malad and a road-over-bridge (ROB) at Vasai Road -Nallasopara.


Andheri-Jogeshwari BMC FOBAndheri-Jogeshwari BMC FOB


Speaking with mid-day, WRs chief public relations officer Sumit Thakur said, "The construction work of the FOBs, skywalk and ROB completed during the lockdown are of the Andheri (Churchgate-end), between Andheri-Jogeshwari (BMC east-west bridge), Marine Lines (Virar-end), Malad (BMC east-west skywalk) and Vasai Road-Nallasopara (old road over bridge)."

"The Andheri FOB (Churchgate-end) connects platforms 8/9, 6/7 and west side, measures 92 metres in length and is 6 metres wide. The Marine Lines FOB (Virar-end) connects platforms 1, 2, 3 and 4, measures 44 metres in length and 6 metres wide, while the Malad (BMC skywalk) connects BMC foot-over-bridge to the station and measures 141 metres in length and 6 metres wide," he added.

Also Read: Mumbai: Peeved motorists tell MMRDA to repair Andheri road ruined during Metro construction

Sources said Andheri has about 7 lakh passengers during rush hours. The two new wide footbridges will go a long way in decongesting the station.

92 metres
Length of foot-over-bridge built by WR at Andheri

Catch up on all the latest Mumbai news, crime news, current affairs, and a complete guide from food to things to do and events across Mumbai. Also download the new mid-day Android and iOS apps to get latest updates.

Mid-Day is now on Telegram. Click here to join our channel (@middayinfomedialtd) and stay updated with the latest news

"Exciting news! Mid-day is now on WhatsApp Channels Subscribe today by clicking the link and stay updated with the latest news!" Click here!


Mid-Day Web Stories

Mid-Day Web Stories

This website uses cookie or similar technologies, to enhance your browsing experience and provide personalised recommendations. By continuing to use our website, you agree to our Privacy Policy and Cookie Policy. OK