shot-button
Subscription Subscription
Home > Mumbai > Mumbai News > Article > Roads bridges may be repaired by hand

Roads, bridges may be repaired by hand

Updated on: 03 December,2011 06:44 AM IST  | 
Rinkita Gurav |

BMC says it doesn't have the machinery to carry out roadwork as per technical committee's recommendations; manual relaying of thinner asphalt layers will delay the Rs 904 crore project

Roads, bridges may be repaired by hand

BMC says it doesn't have the machinery to carry out roadwork as per technical committee's recommendations; manual relaying of thinner asphalt layers will delay the Rs 904 crore project


With just a little over two months to go for the upcoming civic body elections, the Brihanmumbai Municipal Corporation (BMC) seems to have stirred from its slumber over the issue of ill-maintained roads in the city.






Here's the catch. If the BMC decides to do the work as per recommendations made by the Standing Technical Advisory Committee (STAC), it will be forced to press more manpower instead of machines to finish the job, making it more time consuming.

Earlier, the BMC had decided to lay a 40 mm thick layer of mastic asphalt during roadwork. However, during a meeting, STAC member suggested the civic body reduce the thickness to 25 mm.

Inadequate machinery
Commenting on the difficulty faced by the civic body in executing STAC recommendations, an official from BMC's road department, said, "The machines used currently can lay asphalt of only 40 mm thick.

However, if we do not get machinery that can work as per their (STAC) suggestions, the work will have to be carried out manually.

This will only add to the delay, as the workers would have to cut out rectangular parts and then carry out the resurfacing work."

He further mentioned that the entire roadwork must be completed before the next monsoon for which tenders would be floated soon.

STAC speaks
According to STAC Chairperson N V Merani, the 25 mm thick layering is achievable via mechanised process and is a better option, as the entire resurfacing would be over 75 mm thick.
u00a0
"It is a coat that will protect roads from wearing out easily. Besides, mastic asphalt will only enhance their endurance levels.
u00a0
The three layers that would be done mechanically with a proper technique will provide sustainable surfaces for the bridges that have been lying in a bad condition for a long time," said Merani.

Official word
Commenting on the issue, Standing Committee Chairperson and Shiv Sena corporator, Rahul Shewale, said, "We would be approaching the IIT and STAC for suggestions of machinery, and commence work as soon as possible. The bridges would be completed before the next monsoon."

Rs 550 cr
Cost of constructing/repairing major roads

Rs 349 cr
Cost of constructing/repairing minor roads

Rs 5 cr
Cost of resurfacing 34 bridges

"Exciting news! Mid-day is now on WhatsApp Channels Subscribe today by clicking the link and stay updated with the latest news!" Click here!


Mid-Day Web Stories

Mid-Day Web Stories

This website uses cookie or similar technologies, to enhance your browsing experience and provide personalised recommendations. By continuing to use our website, you agree to our Privacy Policy and Cookie Policy. OK