Home / Buzz / Article / Arindam Chaudhuri takes his Living Forever mission global, with the first ‘Live Long, Lead Strong’ workshop in London

Arindam Chaudhuri takes his Living Forever mission global, with the first ‘Live Long, Lead Strong’ workshop in London

Dr. Arindam Chaudhuri advances education and longevity initiatives while advocating reforms for equality, justice and human welfare.

Arindam Chaudhuri.

Arindam Chaudhuri.

Dr. Arindam Chaudhuri has been called the ‘Maverick Management Guru’ by none other than the Financial Times, London, and,  ‘India’s Original Education Entrepreneur’ (by The Print) and ‘Godfather of Private Education in India’ (by Elite Magazine) for pioneering private education in India. IIPM, the Institute that he became the face of, not only charged the highest fees in India but also became the largest B-School on earth. While we are told that with the dream of ‘Education for All’, he is currently planning to launch a new education venture to shut down colleges in India (because he believes no student needs brick and  mortar college education anymore); he is also taking his mission of ‘Longevity for All’, global.

Arindam believes in the possibilities and desirability of Living Forever and, in 2009, he was the first Indian to write on the scientific possibilities of Living Forever and continues to write and take workshops on this under the aegis of Live Long, Lead Strong. Today he has probably the world’s highest number of certifications from Harvard & Stanford alone (50+) on Longevity Science sang Public Health and is spearheading the ‘Longevity for All’ movement in India through his workshops and his initiative, NECTAR: Centre for the Science of Happiness & Longevity.

Other Articles

Mid-Day FastView All