Home / Mumbai / Mumbai News / Photos /
IN PHOTOS: Mumbai airport shuts both runways for six hours for maintenance work on Thursday
Updated On: 19 November, 2026 03:38 PM IST | Tarun Verma
Both runways at Mumbai's Chhatrapati Shivaji Maharaj International Airport remained closed from 11 am to 5 pm on November 19 for scheduled annual post-monsoon maintenance, temporarily suspending flight operations. (Pics/Sayyed Sameer Abedi)

Flight operations at Chhatrapati Shivaji Maharaj International Airport suspended between 11 am and 5 pm on Thursday

Both runways at Mumbai's Chhatrapati Shivaji Maharaj International Airport (CSMIA) remained closed on Thursday, November 19, from 11 am to 5 pm as part of scheduled maintenance work

The temporary closure affected flight operations at one of the country's busiest airports during the six-hour period. Airlines and passengers were required to plan their travel around the runway shutdown

The maintenance work was part of the airport's planned annual post-monsoon runway maintenance exercise, aimed at ensuring the operational safety and reliability of runway infrastructure

Flight operations were expected to resume after 5 pm, subject to the completion of the work

Passengers travelling from Mumbai on Thursday have been advised to check their flight timings and operational status with their respective airlines before leaving for the airport
Recommended Photos
ADVERTISEMENT
ADVERTISEMENT
Photo of Day

Eyes on the ball
Five-year-old Neeraj Jadhav locks his gaze on a delivery during net practice at Shivaji Park. Pic/Atul Kamble

