Home / Mumbai / Mumbai News / Photos / IN PHOTOS: Western Railway ensures uninterrupted Mumbai local train services amid heavy rains

IN PHOTOS: Western Railway ensures uninterrupted Mumbai local train services amid heavy rains

Updated On: 02 July, 2026 01:20 PM IST | Asif Ali Sayed

Western Railway stated that its suburban train services on the Churchgate-Virar corridor continue to operate without any disruption despite heavy rainfall in parts of Mumbai and its suburbs over the past 24 hours. Pics/Satej Shinde and Special Arrangement (Story: Rajendra B. Aklekar)

01
WR officials said that the uninterrupted operations to a series of monsoon preparedness measures carried out ahead of the rainy season. Pics/Satej Shinde and Special Arrangement (Story: Rajendra B. Aklekar)
WR officials said that the uninterrupted operations to a series of monsoon preparedness measures carried out ahead of the rainy season. Pics/Satej Shinde and Special Arrangement (Story: Rajendra B. Aklekar)
02
According to the Western Railway, the preparations before the arrival of the monsoon included extensive desilting of nallahs, side drains and catch-water drains; removal of blockages from drainage channels at vulnerable locations, and installation of high-capacity dewatering pumps at waterlogging-prone spots

According to the Western Railway, the preparations before the arrival of the monsoon included extensive desilting of nallahs, side drains and catch-water drains; removal of blockages from drainage channels at vulnerable locations, and installation of high-capacity dewatering pumps at waterlogging-prone spots

03
The officials also highlighted that the pumps were regularly tested and kept ready for round-the-clock use during heavy rainfall

The officials also highlighted that the pumps were regularly tested and kept ready for round-the-clock use during heavy rainfall

04
Round-the-clock patrolling by Permanent Way staff across the suburban section to detect and immediately attend to any emerging issues

Round-the-clock patrolling by Permanent Way staff across the suburban section to detect and immediately attend to any emerging issues

05
Western Railway also added that they carried out track maintenance works such as track packing, ballast cleaning and formation dressing to improve drainage and reduce the impact of water accumulation on railway tracks

Western Railway also added that they carried out track maintenance works such as track packing, ballast cleaning and formation dressing to improve drainage and reduce the impact of water accumulation on railway tracks

06
Western Railway said its monsoon preparedness focuses on preventive maintenance, including strengthening drainage infrastructure, improving track resilience and conducting mock drills before the onset of the rainy season

Western Railway said its monsoon preparedness focuses on preventive maintenance, including strengthening drainage infrastructure, improving track resilience and conducting mock drills before the onset of the rainy season

Recommended Photos

Next Gallery

Photo of Day

The people’s game

The people’s game

A boy playing football on the shore of Versova Jetty reminds us that we’re in for weeks of FIFA World Cup action. PIC/SHADAB KHAN