Home / Mumbai / Mumbai News / Photos / IN PHOTOS | Mumbai: Work in full swing at Jagannath Shankar Sheth station ahead of Metro Line 3 launch

IN PHOTOS | Mumbai: Work in full swing at Jagannath Shankar Sheth station ahead of Metro Line 3 launch

Updated On: 21 September, 2025 02:38 PM IST | Anushree Gaikwad

Final preparations are underway at Jagannath Shankar Sheth station (Mumbai Central) as Metro Line 3 (Phase II) nears completion. The Aqua Line, Mumbai’s first fully underground metro corridor, is set to become fully operational from September 30. (PIC / SHADAB KHAN)

01
The much-anticipated launch will be marked by an inauguration ceremony led by Prime Minister Narendra Modi in Mumbai. PIC/ SHADAB KHAN
The much-anticipated launch will be marked by an inauguration ceremony led by Prime Minister Narendra Modi in Mumbai. PIC/ SHADAB KHAN
02
According to reports, Metro Line 3 is Mumbai’s first completely underground metro corridor, connecting the western suburbs, central Mumbai, and the southern tip, all without touching surface-level roads

According to reports, Metro Line 3 is Mumbai’s first completely underground metro corridor, connecting the western suburbs, central Mumbai, and the southern tip, all without touching surface-level roads

03
Stretching 33.5 km from Aarey in the north to Cuffe Parade in the south, this new corridor comprises 27 stations

Stretching 33.5 km from Aarey in the north to Cuffe Parade in the south, this new corridor comprises 27 stations

04
Once fully operational, it’s expected to carry up to 13 lakh passengers daily, making it a crucial lifeline for Mumbai’s north-south movement

Once fully operational, it’s expected to carry up to 13 lakh passengers daily, making it a crucial lifeline for Mumbai’s north-south movement

05
The upcoming stretch of Mumbai Metro Line 3 (Aqua Line) will feature 11 key underground stations, enhancing north-south connectivity through the city's core

The upcoming stretch of Mumbai Metro Line 3 (Aqua Line) will feature 11 key underground stations, enhancing north-south connectivity through the city's core

06
The stations include: Science Museum, Mahalaxmi, Mumbai Central, Grant Road, Girgaon, Kalbadevi, CSMT, Hutatma Chowk, Churchgate, Vidhan Bhavan, and Cuffe Parade. This phase is set to significantly ease commuting in South Mumbai, linking business hubs, residential zones, and historic precincts through a high-capacity, fully underground metro corridor, as per the reports

The stations include: Science Museum, Mahalaxmi, Mumbai Central, Grant Road, Girgaon, Kalbadevi, CSMT, Hutatma Chowk, Churchgate, Vidhan Bhavan, and Cuffe Parade. This phase is set to significantly ease commuting in South Mumbai, linking business hubs, residential zones, and historic precincts through a high-capacity, fully underground metro corridor, as per the reports

Recommended Photos

Next Gallery

Photo of Day

Upward bound

Upward bound

Workers install a new poster on a billboard near Mahim Causeway. Pic/Satej Shinde