Home / Mumbai / Mumbai News / Photos /
In Photos: Technical inspection of Metro 4 and 4-A from Gaimukh to Vijay Garden
Updated On: 22 September, 2025 12:48 PM IST | Tarun Verma
The first test run of a 10-kilometre section of Thane Metro 4 was successfully conducted on Monday, September 22, marking a major milestone in the city’s rapid public transport development. The trial, attended by Chief Minister Devendra Fadnavis and Deputy CM Eknath Shinde. (Pics/Satej Shinde)


Metro Line 4 is set to strengthen the connectivity between Mumbai’s eastern and western suburbs, benefiting a wide spectrum of the population, including daily commuters, students, and working professionals.

Maharashtra Transport Minister Pratap Sarnaik highlighted the transformative impact of the metro line on the region’s transportation landscape.

The first trial run of Thane Metro 4 marks a significant milestone in the ongoing development of the city’s rapid transit network.

The trial was carried out on the stretch between Cadbury Junction and Kasarvadavali, which has now been completed and cleared for operational testing.

Chief Minister Devendra Fadnavis, along with Deputy Chief Minister Eknath Shinde, was also present during the first trial run.
Recommended Photos
ADVERTISEMENT
ADVERTISEMENT
Photo of Day

All wings on deck
Seagulls hitchhike on a wandering fishing boat in the Manori Creek near Marve Jetty. Pic/Satej Shinde

