Home / Mumbai / Mumbai News / Photos / IN PHOTOS: Trial run of Mumbai's Colaba-Bandra-SEEPZ Metro line 3 begins

IN PHOTOS: Trial run of Mumbai's Colaba-Bandra-SEEPZ Metro line 3 begins

Updated On: 30 August, 2022 11:55 AM IST |

The Mumbai Metro Rail Corporation Limited (MMRCL) launched the trial run of the Colaba-Bandra-SEEPZ Metro line-3 at Sariput Nagar in Aarey Colony. PicS/Shadab Khan

Pic/Shadab Khan

1/5

Pic/Shadab Khan
Maharashtra Chief Minister Eknath Shinde and Deputy CM Devendra Fadnavis flagged off the trial run

2/5

Maharashtra Chief Minister Eknath Shinde and Deputy CM Devendra Fadnavis flagged off the trial run

Before giving the green signal, Shinde and Fadnavis examined the Metro train

3/5

Before giving the green signal, Shinde and Fadnavis examined the Metro train

The Metro line 3, which will be a 33.5 km underground route, will connect south Mumbai with the western suburbs and is expected to reduce the burden on the suburban locals

4/5

The Metro line 3, which will be a 33.5 km underground route, will connect south Mumbai with the western suburbs and is expected to reduce the burden on the suburban locals

The construction of Metro car shed at Aarey was one of the first decisions reversed by the Shinde-Fadnavis government

5/5

The construction of Metro car shed at Aarey was one of the first decisions reversed by the Shinde-Fadnavis government

Photo of Day

Cutting corners

Cutting corners

A man sits down for a haircut at a makeshift roadside barbershop in Deonar. PIC/SAYYED SAMEER ABEDI

Advertisement