Home / Mumbai / Mumbai News / Photos / IN PHOTOS: Trial run of Mumbai's Colaba-Bandra-SEEPZ Metro line 3 begins

IN PHOTOS: Trial run of Mumbai's Colaba-Bandra-SEEPZ Metro line 3 begins

Updated On: 30 August, 2022 11:55 AM IST |

The Mumbai Metro Rail Corporation Limited (MMRCL) launched the trial run of the Colaba-Bandra-SEEPZ Metro line-3 at Sariput Nagar in Aarey Colony. PicS/Shadab Khan

01
Pic/Shadab Khan
Pic/Shadab Khan
02
Maharashtra Chief Minister Eknath Shinde and Deputy CM Devendra Fadnavis flagged off the trial run

Maharashtra Chief Minister Eknath Shinde and Deputy CM Devendra Fadnavis flagged off the trial run

03
Before giving the green signal, Shinde and Fadnavis examined the Metro train

Before giving the green signal, Shinde and Fadnavis examined the Metro train

04
The Metro line 3, which will be a 33.5 km underground route, will connect south Mumbai with the western suburbs and is expected to reduce the burden on the suburban locals

The Metro line 3, which will be a 33.5 km underground route, will connect south Mumbai with the western suburbs and is expected to reduce the burden on the suburban locals

05
The construction of Metro car shed at Aarey was one of the first decisions reversed by the Shinde-Fadnavis government

The construction of Metro car shed at Aarey was one of the first decisions reversed by the Shinde-Fadnavis government

Recommended Photos

Next Gallery

Photo of Day

Upward bound

Upward bound

Workers install a new poster on a billboard near Mahim Causeway. Pic/Satej Shinde