Elphinstone Road
Less than two weeks after mid-day highlighted unsafe conditions outside Prabhadevi railway station during the bridge demolition, authorities have cleared the congested approach road, removed construction material, installed barricades
Updated 13 days ago

The approach road to Prabhadevi railway station has turned muddy after rain amid ongoing bridge construction, with commuters in Mumbai raising safety concerns and recalling the 2017 stampede
Updated 24 days ago
Central Railway announces midnight blocks this weekend
Updated 3 months ago
Railway dismantle 100-year-old Prabhadevi bridge structure in mega block
Updated 4 months ago
Railways must take every step to prevent stampedes
Updated 7 months ago
Mumbai: Prabhadevi choke point raises fresh stampede fears after bridge closure
Updated 7 months ago
ADVERTISEMENT
Elphinstone bridge to be dismantled in November for double-deck connector
Updated 8 months ago
Elphinstone bridge demolition hits food stalls, boosts cobblers and repair shops
Updated 8 months ago
Prabhadevi–Parel foot overbridge finally opens, but only for rail commuters
Updated 10 months ago
Kudos to Railways for preserving historical relics
Updated 10 months ago
ADVERTISEMENT







