Voter turnout of 60.96 per cent was recorded till 7 pm in phase two of the Lok Sabha elections held on Friday across 88 constituencies spread in 13 states, the Election Commission said. Pics/PTI
26 April,2024 10:09 PM IST | Asif Ali SayedThe second phase of Lok Sabha Elections 2024 in Maharashtra witnessed a notable turnout, with over 53 per cent of eligible voters casting their ballots across eight constituencies in the state. Pics/ PTI & X
26 April,2024 08:11 PM IST | Mumbai | Sanjana DeshpandeAs the country enters the second phase of Lok Sabha elections 2024, we take a look at how the senior citizens are defying age and stepping out to cast their vote and fulfill their duty towards the nation
26 April,2024 06:30 PM IST | EditorOver 39 per cent voter turnout was recorded in the first six hours of polling on Friday in phase two of the Lok Sabha elections 2024 covering 88 seats in 13 states and Union territories amidst reports of EVM glitches and bogus voting in some booths in Kerala and West Bengal (Pics/PTI)
26 April,2024 02:53 PM IST | ronak mastakarAn aggregate 60.03 per cent voter turnout was recorded till 7 pm in phase one of the Lok Sabha polls on Friday, the Election Commission said. Pics/PTI
19 April,2024 08:36 PM IST | Asif Ali SayedTop leaders in Maharashtra including Deputy Chief Minister Devendra Fadnavis and Union Minister Nitin Gadkari cast their votes in Lok Sabha Elections 2024 Phase 1. Pics/ PTI & X
19 April,2024 07:13 PM IST | Sanjana DeshpandeIndia is all set for Lok Sabha elections with 28 states and eight Union Territories going to polls. The seven-phase Lok Sabha elections will begin on April 19. Pics/PTI
18 April,2024 08:13 PM IST | Asif Ali SayedThe southbound carriageway of the coastal road between Worli and Marine Drive in Mumbai was opened for traffic on Tuesday morning, an official said. Pics/PTI and CMO
12 March,2024 02:03 PM IST | Asif Ali SayedMaharashtra CM Eknath Shinde on Monday inaugurated the first phase of the coastal road between Worli and Marine Drive. On the occassion, he said that it is an "engineering marvel". Pics/Shadab Khan
11 March,2024 02:02 PM IST | Asif Ali SayedThe Coastal Road project spans 35.6 kilometers and incorporates a mix of reclaimed land, bridges, elevated roads and tunnels along the Arabian Sea coastline. Today marks the launch of Phase 1 of this transformative infrastructure, which is poised to address the longstanding transportation issues and alleviate the burden on existing roadways
11 March,2024 12:21 PM IST | EditorADVERTISEMENT