Home / Mumbai / Mumbai News / Article /
Maker Towers skipped fire safety audits for two years
Updated On: 19 October, 2016 10:00 AM IST | | Laxman Singh and Pallavi Smart
Committee member admits to lapse but says the housing society installed fire doors after suggestions from fire brigade during last audit


The last time an audit was done, the fire brigade had suggested the society to install a fire door in the buildings, which was complied with, and having one more hose in the six-building complex for more effective fire-fighting. Pics/PTI, Bipin Kokate
It could have been possible to avert the tragic fire that broke out yesterday on the 20th floor of a Maker Towers building, had the posh housing society not skipped its biannual fire safety audit. The last fire audit of the building was done two years ago.
Trending Stories
ADVERTISEMENT
ADVERTISEMENT


