Home / Mumbai / Mumbai News / Article /
Mumbai: Partial traffic on Pedder Road may resume today
Updated On: 15 September, 2020 07:02 AM IST | Mumbai | Prajakta Kasale
On August 5, heavy rain led to a landslide at Malabar Hill in which the retaining wall of B G Kher Road collapsed and the road caved in

The barricade being put on the road at Kemps corner on Monday
Much to the relief of motorists travelling to and from South Mumbai, one side of the busy Pedder Road will reopen, very likely from today. The road was closed to vehicular traffic after the August 5 landslide at Malabar Hill.
A section of N S Patkar Road connecting to Pedder Road Bridge will be reopened. Civic officials said work is underway to barricade the remaining section of the road, which is expected to be completed by Tuesday morning. About 800-metre-long stretch remained to be barricaded on Monday.
Trending Stories
ADVERTISEMENT
ADVERTISEMENT


