Home / Mumbai / Mumbai News / Article / Mumbai rains: Clogged drains due to BKC flyover work may cause flooding

Mumbai rains: Clogged drains due to BKC flyover work may cause flooding

Railways writes to MMRDA that obstructions in the drains will lead to disruption of services and inconvenience commuters; MMRDA denies wrong-doing +5:05 AM 07-Jun-18

  • WhatsAppBookmarkBookmark
Listen to this article :

The plinths for the connector bridge have been constructed right where the footpath and drain used to be on LBS Marg, along the west side of Sion station. Pic/Sayyed Sameer Abedi
The plinths for the connector bridge have been constructed right where the footpath and drain used to be on LBS Marg, along the west side of Sion station. Pic/Sayyed Sameer Abedi

Sion railway station, already quick to flood, could now possibly be at even more danger of getting submerged. Sources from the Central Railway have alleged that the drain near the low-lying station was tampered with during the ongoing construction of the connector bridge between the Eastern Express Highway and Bandra-Kurla Complex (BKC). However, MMRDA, the agency in charge, has refuted the claim.

Read Next Story
Viral clip: From managing traffic in downpour to being inundated with congrats

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All