Home / Mumbai / Mumbai News / Article /
Mumbai: Work on Byculla zoo aviary will be completed before deadline
Updated On: 12 November, 2020 07:09 AM IST | Mumbai | A correspondent
The work on the aviary was carried out in full swing along with other animal enclosures as a part of Phase II of zoo revamp during the lockdown

Brihanmumbai Municipal Corporation. File pic
The Brihanmumbai Municipal Corporation (BMC) looks all likely to complete the work on bird aviary at Veer Mata Jijabai Bhosale Udyan And Zoo (Byculla Zoo) well before its December-end deadline. However, with the zoo currently shut owing to the lockdown, the civic body is in discussions over what precautionary measures need to be carried out, once it reopens.
The work on the aviary was carried out in full swing along with other animal enclosures as a part of Phase II of zoo revamp during the lockdown.
Trending Stories
ADVERTISEMENT
ADVERTISEMENT


