Home / Search / Andheri

Andheri

The BMC aims to complete Mumbai’s 1.75-km JVPD flyover by December 31, 2027, ahead of the scheduled March 2028 deadline. The project is expected to bypass five major traffic junctions and reduce peak-hour travel time from 45 minutes to around 20 minutes

Updated 2 days ago

The 1.75-km-long flyover, which will be 15.10 metres wide, is being constructed from the end of the CD Barfiwala flyover in Andheri West to the Juhu-Versova Link Road. PIC/BY SPECIAL ARRANGEMENT

Andheri Railway Police traced two missing minor siblings, aged five and nine, within 24 hours of their disappearance from Andheri Railway Station in Mumbai. Acting on a tip-off, a police team located the children safely in Borivali East and brought them to the police station

Updated 2 days ago

The 1.75-km-long flyover, which will be 15.10 metres wide, is being constructed from the end of the CD Barfiwala flyover in Andheri West to the Juhu-Versova Link Road. PIC/BY SPECIAL ARRANGEMENT