The 125-year-old structure Elphinstone Bridge in Mumbai has been closed to make way for the Sewri–Worli Elevated Connector, which will link the sea link, coastal road and Atal Setu. Authorities have begun the excavation work for its demolition. PHOTOS/ASHISH RAJE
19 September,2025 10:25 PM IST | Divya NairThe 125-year-old Elphinstone Road overbridge, a vital link between Parel and Prabhadevi, was closed on Friday midnight to make way for the Sewri-Worli Elevated Connector, causing inconvenience for commuters and pedestrians. mid-day.com lensmen Sayyed Sameer Abedi and Ashish Raje captured scenes from Day 1 after the bridge closure
13 September,2025 08:24 PM IST | Divya NairDemolition of the more-than-century-old Elphinstone Road Over Bridge (ROB), a crucial east-west link in central Mumbai, began on Friday evening to facilitate its reconstruction. (Pics/Ashish Raje)
13 September,2025 12:42 PM IST | ronak mastakarThe civic authorities on Friday began preparations to close the Elphinstone Bridge in central Mumbai as part of a plan to demolish the old structure. Pics/Ashish Raje
12 September,2025 07:09 PM IST | Asif Ali SayedADVERTISEMENT