Home / Mumbai / Mumbai News / Article / 100% water cut in South Mumbai, Bandra on Thursday

100% water cut in South Mumbai, Bandra on Thursday

Repair work on pipeline to take 12 hrs to be completed

Listen to this article :

Representation pic
Representation pic

There will be 100 per cent water cut and low pressure supply in parts of the city on Thursday. According to civic officials from the water department, the civic body has proposed to carry out repair work on the 1,200mm diameter pipe installed in the 1,200 mm diameter Mahim tunnel shaft connected to the Tansa (west) pipeline. The work will be executed from 8 am to 8 pm tomorrow. During the work, the tunnel running through Marol Maroshi-Vakola-Ruparel-Race Course will be isolated for a 12-hour period.

Read Next Story
Ordeal ends for family who had to travel 70 km over 7 hours for medical aid

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement