Home / Mumbai / Mumbai News / Article /
BMC chief Ajoy Mehta wants left over building materials cleared from roads
Updated On: 18 April, 2018 08:04 PM IST | Mumbai | A Correspondent
While the road works and storm water drains reconstruction and repairs are going on in full swing, it is the material which is dumped at the corners of the roads and never cleared, that has been a cause of concern as it could lead to clogged drains


The pothole ridden stretch on Sion-Panvel Highway
Ahead of the monsoon, the BMC wants to ensure there are no leftovers on roadsides from repair works. While the road works and storm water drains reconstruction and repairs are going on in full swing, it is the material which is dumped at the corners of the roads and never cleared, that has been a cause of concern as it could lead to clogged drains during heavy showers. BMC commissioner Ajoy Mehta has now decided to hold the executive engineers responsible, if such a problem comes up during the monsoon.
For the latest Mumbai Monsoon coverage, including weather forecasts, rain alerts, transport disruptions, lake levels, and civic advisories, visit our Mumbai Monsoon News hub.


