Home / Mumbai / Mumbai News / Article /
Rs 13,000 crore vs the monsoon: Mumbai civic body unveils flood mitigation plan
Updated On: 31 July, 2026 11:10 AM IST | Mumbai | Eeshanpriya MS
The BMC has unveiled a 13,000-crore Integrated Flood Mitigation Plan featuring a permanent solution for the Andheri subway, 33 automated floodgates, upgraded stormwater drains, mangrove and wetland restoration, and other nature-based measures.

Flooded Andheri subway earlier this month. File pic/Atul Kamble
A permanent solution to flooding at the Andheri subway, 33 automated floodgates at outfalls to keep out tidal water, wider stormwater drains capable of handling up to 100-120 mm of rainfall per hour, restoration of mangroves and wetlands, and nature-based measures such as permeable footpaths and bioretention systems are among the key proposals in the Brihanmumbai Municipal Corporation’s (BMC) Rs 13,000-crore Integrated Flood Mitigation Plan.
The plan combines large-scale engineering works with ecological interventions to strengthen Mumbai’s resilience against flooding. mid-day had first reported in March that the BMC had submitted a Rs 10,000-crore flood mitigation and capacity-strengthening proposal to the National Disaster Management Authority (NDMA) under the Urban Flood Risk Management Programme (UFRMP), seeking financial assistance.
For the latest Mumbai Monsoon coverage, including weather forecasts, rain alerts, transport disruptions, lake levels, and civic advisories, visit our Mumbai Monsoon News hub.




