Home / Mumbai / Mumbai News / Article /
CR services running late
Updated On: 27 February, 2009 07:18 PM IST | | Sanjeev Devasia
Central Railway train services were thrown out of gear after an OHE cable snapped between Thane and Parsik tunnel.
Listen to this article :
Central Railway train services were thrown out of gear after an OHE cable snapped between Thane and Parsik tunnel.
This resulted in trains running around 25 minutes from 5 pm. This was not all, at Currey Road station, a CST bound local stopped halfway through the platform and half of the passengers on board had to get down on the tracks leading to chaos at 5.10 pm.
Read Next Story


