Home / Mumbai / Mumbai News / Article /
Five flyovers in limbo after MMRDA seeks realignment
Updated On: 05 July, 2015 09:00 AM IST | | Tanvi Deshpande
The civic body had planned five flyovers along the New Link Road, to ease traffic congestion, but MMRDA wants these proposed structures realigned, citing the present alignment of the Metro-II project
Five flyovers proposed by the BMC along the New Link Road, which would have eased traffic on the Western Express Highway (WEH) and SV Road, are now on the backburner after the Mumbai Metropolitan Region Development Authority (MMRDA) wrote to the civic body, asking for a realignment of the project.
According to a letter dated June 4, the MMRDA has asked the BMC to build the bridges across the Link Road instead of alongside, considering the alignment of the Metro-II project, which will pass through the area. The BMC maintains that the purpose of the project would be lost if realignment is considered. The total cost of the project is estimated at around R380 crore.


