Home / Mumbai / Mumbai News / Article /
MMRDA opts for higher sea link instead of costlier, movable kind
Updated On: 13 May, 2015 08:01 AM IST | | Ranjeet Jadhav
<p>The Maharashtra Maritime Board had asked the authority to have a movable bridge, but due to increasing cost, it was decided to go for a higher bridge</p>
Listen to this article :

After Mumbai, Raigad will be the second place in Maharashtra to get this long sea link.
The issue of the construction of the 2 km long Rewas-Karanja bridge has been resolved as Mumbai Metropolitan Region Development Authority (MMRDA) has decided to raise the height of the bridge, so that ships can pass below it.

After Mumbai, Raigad will be the second place in Maharashtra to get this long sea link. Illustration/Amit Bandre

