Home / Mumbai / Mumbai News / Article /
Mulund bridge not falling down, assures BMC
Updated On: 13 July, 2019 07:42 AM IST | Mumbai | Rajendra B. Aklekar
Gaping gap in bridge is just a construction joint that will be refilled soon, officials claimed, after inspection by CR and BMC

Keshav Joshi had written to the CR after he spotted the huge crack
The Mulund rail overbridge is safe for use, claimed a team of Central Railway and BMC officials visiting it on Friday morning following mid-day's report regarding the bridge having major a crack.
Mulund resident and member of a local NGO, Keshav Joshi, had written to the Central Railway after he spotted the crack. Officials, however, said that the gap is a construction joint as per the design and that the rain had washed away the asphalt filling in it, which will soon be refilled.


