Home / Mumbai / Mumbai News / Article /
Mumbai: Section of King Circle railway bridge dislocates
Updated On: 28 February, 2020 02:35 PM IST | Mumbai | mid-day online correspondent
A huge traffic snarl was caused when the height barrier installed before the King Circle railway bridge dislodged

The incident took place when a vehicle accidentally rammed into the height-barrier installed below the King Circle railway bridge. Picture/Twitter Payal Mota
On Friday morning, commuters travelling towards Dadar faced a major traffic snarl as a small section of the King Circle railway bridge dislocated. According to reports, the incident took place at around 7.30 am in the morning.
Under King circle station bridge pic.twitter.com/m29jGvmIow
— Payal Mota (@PayalSMota) February 28, 2020
Sources said that Harbour line local trains pass through the King Circle railway bridge which is built above the road. A huge traffic snarl was caused when the height barrier installed before the King Circle railway bridge dislodged.


