Home / Mumbai / Mumbai News / Article /
Mumbai: BMC clears 70-metre stretch in Dahisar, expects traffic relief
Updated On: 19 November, 2026 09:51 AM IST | Mumbai | mid-day online correspondent
The BMC has removed 19 structures in Dahisar's Patilwadi area to facilitate road widening under its Pedestrian First campaign. The civic body plans to construct a cement concrete road on the cleared stretch to improve traffic movement and connectivity

BMC removes 19 structures in Patilwadi area of Dahisar (Pic/Special arrangement)
The Brihanmumbai Municipal Corporation (BMC) on Wednesday, November 18, evicted 19 structures affected by road widening in the Patilwadi area of Dahisar, clearing a stretch measuring approximately 70 metres in length and 18.30 metres in width.
As per the officials, the eviction drive was carried out by the civic body's R North division as part of its 'Pedestrian First' campaign, aimed at removing encroachments and traffic bottlenecks to improve road connectivity and ensure smoother movement of vehicles and pedestrians.


