Home / Mumbai / Mumbai News / Article /
Mumbai: Goregaon-Mulund link road project proposed in four phases, will have underground twin tunnel
Updated On: 15 October, 2022 08:10 PM IST | Mumbai | mid-day online correspondent
The total length of GMLR is 12.2 Km with an underground twin tunnel below Sanjay Gandhi National Park (SGNP) of length 4.7 Km. The completion of the GMLR will vastly decongest the existing road network of the Mumbai’s suburbs, the BMC said

Representational Pic. iStock
The Goregaon-Mulund Link Road (GMLR) Project being undertaken by the BMC is proposed to constructed in four phases, the Brihanmumbai Municipal Corporation (BMC) said.
In an official statement on Saturday, the BMC said, the fourth and the most important East-West link planned for providing the much-needed connectivity for the suburbs. At present the existing road connectivity from east to west of Santacruz – Chembur Link Road , Andheri – Ghatkopar Link Road, Jogeshwari – Vikhroli Link Road are already saturated resulting into traffic congestion and subsequent impact on the environment. The GMLR envisages road connectivity from Western Express Highway at Goregaon in the Western suburb to Eastern Express Highway at Mulund in the Eastern suburb.


