Home / Mumbai / Mumbai News / Article / MMRDA launches special safety inspection of Mumbai's Metro Line-4 after Mulund incident

MMRDA launches special safety inspection of Mumbai's Metro Line-4 after Mulund incident

In an official order issued by Additional Metropolitan Commissioner Ashwin Mudgal (IAS), the MMRDA has directed a mandatory corridor-wide safety inspection of the entire Metro Line-4 stretch as a preventive and corrective measure

Listen to this article :
The operation began on Sunday and is expected to continue for three to four days. PIC VIA RAJENDRA B AKLEKAR

The operation began on Sunday and is expected to continue for three to four days. PIC VIA RAJENDRA B AKLEKAR

The Mumbai Metropolitan Region Development Authority (MMRDA) has constituted a high-level Special Intensive Safety Inspection Team for the under-construction Metro Line-4 (Wadala to Kasarvadavali) following the slab collapse near Pier No. P196 in Mulund on Saturday.

In an official order issued by Additional Metropolitan Commissioner Ashwin Mudgal (IAS), the MMRDA has directed a mandatory corridor-wide safety inspection of the entire Metro Line-4 stretch as a preventive and corrective measure.

How do you like the new new mid-day.com experience? Share your feedback and help us improve.

Read Next Story
Maharashtra: Five injured, 40 two-wheelers destroyed as massive fire breaks out at Dombivli building

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement