Home / Mumbai / Mumbai News / Article / MMRDA to soon build 4.98-km long bridge connecting Vasai and Bhayandar

MMRDA to soon build 4.98-km long bridge connecting Vasai and Bhayandar

The bridge is expected to be operational by September 2024.

  • WhatsAppBookmarkBookmark
Listen to this article :
The bridge will be constructed over the Bhayandar creek and is expected to be operational by September 2024

The bridge will be constructed over the Bhayandar creek and is expected to be operational by September 2024

Motorists who often get stuck between Vasai and Bhayandar on Mumbai Ahmedabad highway will soon have a reason to smile. The Mumbai Metropolitan Region Development Authority (MMRDA) will be constructing a six-lane bridge over the Bhayandar creek connecting Vasai west to Bhayandar west and is expected to be operational by September 2024.

The distance between Vasai west and Bhayandar west on Mumbai Ahmedabad highway is currently 30 km and the normal time required to cover this distance is about 45 minutes. But, during peak hours it takes around 60-90 minutes. However, once operational, the new bridge will cut the distance down to 5km and the travel time to less than 10 minutes.

Read Next Story
BMC to develop app to help travellers track tourist-friendly places›

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All