Home / Mumbai / Mumbai News / Article /
Mumbai: Rail Minister Suresh Prabhu keen on new signalling system
Updated On: 22 February, 2016 11:42 AM IST | | Shashank Rao
The Communication-Based Train Control system will help improve frequency; upon total implementation, officials say frequency between two trains will be down by 90 secs

Three days from now (February 25), union Railway Minister Suresh Prabhu will present his second rail budget, in which there are two projects awaiting approval for Mumbai. These are the Virar-Vasai-Diva-Panvel suburban rail corridor, and the Communication-Based Train Control (CBTC) system. The latter is said to be a breakthrough for improving frequency of the dense suburban system, and for this, a workshop was arranged for officials on February 17, by the Mumbai Rail Vikas Corporation (MRVC).

The first CBTC system has been proposed on the CST-Panvel Harbour line at a cost of Rs 4,500 cr. File picture for representation




