Home / Mumbai / Mumbai News / Article /
PWD instructs MSRDC to repair uneven paver block road at Sion-Panvel Highway
Updated On: 26 March, 2014 12:57 PM IST | | Ranjeet Jadhav
<p>The PWD has found that the shoddy work done by the contractor appointed by MSRDC is the reason for the bad condition of road at Priyadarshini Circle on Sion-Panvel Highway</p>
Mumbai: The Public Works Department (PWD) which looks after the maintenance of Sion-Panvel Highway have found the reason behind the bad condition of the road stretch near Priyadarshini Circle because of which the motorists have to drive through uneven paver blocks patch and witness bumpy rides.
The PWD has found that the shoddy work done by the contractor appointed by MSRDC is the reason for the bad condition of the road.
How do you like the new new mid-day.com experience? Share your feedback and help us improve.

