Home / Mumbai / Mumbai News / Article /
Inaugurated but still shut: Two-wheeler riders push aside barricades at Sion bridge
Updated On: 23 October, 2026 10:38 AM IST | Mumbai | Sayyed Sameer Abedi | Ritika Gondhalekar
Barred from using Sion bridge after inauguration, as ceremony pandal had to be razed first, two-wheeler riders push aside heavy barriers

Bikers haul concrete barriers aside in a bid to use the Sion rail overbridge less than an hour after the structure was inaugurated on Thursday afternoon. PICS/SAYYED SAMEER ABEDI
Frustration boiled over near the newly inaugurated Sion rail overbridge on Thursday afternoon when around 100 two-wheeler riders, angered by the delay in opening the structure to the public, moved heavy concrete barricades to make way for bikes travelling from Sion station towards Dharavi.
A civic official present near the Sion bridge informed senior mid-day photographer Sayyed Sameer Abedi that the formal inauguration had taken place between 1 pm and 1.30 pm, but the bridge would be fully opened to the public only between 5 pm and 6 pm, as a pandal on one side of the structure was to be dismantled by evening.


