LBS Road footpath, widest at 2 feet, reduces to 30 cm at some locations; getting worse at the Vikhroli road overbridge (ROB) junction, the footpath is barely walkable as at every 10 meters
29 November,2025 08:14 AM IST | Mumbai | Madhulika Ram KavatturBMC directs contractors to ensure all footpaths reinstated; for months, residents in Santacruz West had been grappling with narrowed roads, dug-up pathways, barricaded stretches, and traffic disruptions caused by various civic works, including STP-related pipeline installations, underground civil works and road concreting works
17 November,2025 07:12 AM IST | Mumbai | Ritika GondhalekarLocals slam civic body for dismantling yet another pavement, endangering citizens; officials say measure is temporary
30 October,2025 12:41 PM IST | Mumbai | Ritika GondhalekarThe main concern is that roads and footpaths are at the same height, so vehicles will drive on both, creating a hazard for those who need a pavement to walk on
14 May,2025 06:39 AM IST | Mumbai | The EditorialADVERTISEMENT