Home / Mumbai / Mumbai News / Article /
Mid-day impact: Andheri Metro station gets temporary lighting, residents seek removal of construction material
Updated On: 14 September, 2026 08:19 AM IST | Mumbai | Ranjeet Jadhav
Authorities set up temporary lights beneath Swami Samarth Nagar Metro station; locals say they also got rid of footpath encroachments

The under-construction Metro Pink Line 6 in Swami Samarth Nagar, Andheri West, is lit up on Friday night
Taking note of mid-day’s report highlighting the lack of illumination around the under-construction Swami Samarth Nagar Metro station in Lokhandwala, Andheri West, the contractor concerned has installed temporary lights beneath the piece of infrastructure. However, locals say the lighting alone is not enough. They are now demanding that the construction material stored beneath the station and along the footpath be cleared immediately.

The under-construction Metro Pink Line 6 in Swami Samarth Nagar, Andheri West, is shrouded in darkness on September 1
Trending Stories
ADVERTISEMENT
ADVERTISEMENT


