Home / Mumbai / Mumbai News / Article /
Mumbai airport shares first look at proposed Terminal 1 revamp, here’s what will change
Updated On: 28 October, 2026 10:49 PM IST | Mumbai | mid-day online correspondent
Mumbai airport has shared artistic impressions of its proposed Terminal 1 revamp, showcasing plans for indoor greenery, a giant flamingo sculpture and a larger check-in hall. The redevelopment aims to raise annual passenger capacity from 15 million to 20 million

Artist’s rendering of the interior of the redeveloped Terminal 1 at CSMIA, showing the spacious arrival/departure hall with large glass walls. PIC/BY SPECIAL ARRANGEMENT
The Chhatrapati Shivaji Maharaj International Airport (CSMIA) has shared artistic impressions of its proposed Terminal 1 (T1) redevelopment, outlining a vision for a modern, passenger-centric terminal that reflects Mumbai’s cultural identity.
The visuals were shared during a meeting with the Airport Airline Operators Committee (AOC). The airport clarified that the images represent the architectural vision for the proposed terminal and are not a definitive preview of the final design.


