Kolkata Metro has deployed a 4 MW/6.4 MWh Battery Energy Storage System to enhance operational resilience. The system ensures stranded trains can reach the next station at speeds of up to 55 kmph during power disruptions
A Kolkata Metro train. File pic
Kolkata Metro Railway (KMR) introduced India’s first battery backup system as it commissioned a Battery Energy Storage System (BESS) on the underground stretch of the Blue Line.
To enhance operational resilience, KMR has deployed a 4 MW/6.4 MWh battery energy storage. As per reports, the stored power can move stranded trains at speeds of up to 55 kmph from mid-tunnel to the next station in case of a power failure.
This story has been sourced from a third party syndicated feed, agencies. Mid-day accepts no responsibility or liability for its dependability, trustworthiness, reliability and data of the text. Mid-day management/mid-day.com reserves the sole right to alter, delete or remove (without notice) the content in its absolute discretion for any reason whatsoever
Subscribe today by clicking the link and stay updated with the latest news!" Click here!


