03 August,2020 07:06 AM IST | Mumbai | Rajendra B Aklekar
The Andheri FOB (Churchgate-end)
A year after mid-day highlighted the issue of crowding at Ghatkopar station leading to Railway Minister Piyush Goyal giving directives to improve conditions of both Ghatkopar and Andheri stations, the Western Railway (WR) on Sunday announced that it had completed two large six-metre wide bridges at Andheri.
Goyal's directives came after mi-day ran a front-page story on August 30, 2019, seeking local railway officials' attention to improve and decongest Ghatkopar and Andheri stations, which share a common interface with Mumbai Metro Line 1. Apart from two FOBs at Andheri, WR also announced the completion of one more FOB at Marin Lines station, one skywalk at Malad and a road-over-bridge (ROB) at Vasai Road -Nallasopara.
ALSO READ
Weekly horoscope: Check astrological predictions for all zodiac signs
Two teen boys drown, three missing in water-filled pit in Palghar
HC asks Mira-Bhayandar civic body to consider fresh plea on animal slaughter
Nod to prosecute Arundhati Roy under UAPA 'misuse of power': Sharad Pawar
No question of taking back rebels, says Sharad Pawar
Speaking with mid-day, WRs chief public relations officer Sumit Thakur said, "The construction work of the FOBs, skywalk and ROB completed during the lockdown are of the Andheri (Churchgate-end), between Andheri-Jogeshwari (BMC east-west bridge), Marine Lines (Virar-end), Malad (BMC east-west skywalk) and Vasai Road-Nallasopara (old road over bridge)."
"The Andheri FOB (Churchgate-end) connects platforms 8/9, 6/7 and west side, measures 92 metres in length and is 6 metres wide. The Marine Lines FOB (Virar-end) connects platforms 1, 2, 3 and 4, measures 44 metres in length and 6 metres wide, while the Malad (BMC skywalk) connects BMC foot-over-bridge to the station and measures 141 metres in length and 6 metres wide," he added.
Also Read: Mumbai: Peeved motorists tell MMRDA to repair Andheri road ruined during Metro construction
Sources said Andheri has about 7 lakh passengers during rush hours. The two new wide footbridges will go a long way in decongesting the station.
92 metres
Length of foot-over-bridge built by WR at Andheri
Catch up on all the latest Mumbai news, crime news, current affairs, and a complete guide from food to things to do and events across Mumbai. Also download the new mid-day Android and iOS apps to get latest updates.
Mid-Day is now on Telegram. Click here to join our channel (@middayinfomedialtd) and stay updated with the latest news