Home / Mumbai / Mumbai News / Article /
CR, WR turn lockdown to their advantage, fix old, dangerous bridges
Updated On: 05 May, 2020 07:11 AM IST | Mumbai | Rajendra B Aklekar
Bridges that IIT-Bombay declared unsafe for public use in its survey last year get a facelift as city remained shut to contain the spread of COVID-19

The old Byculla road overbridge was patched up with 70 bracket fixtures over the past 26 days
Finally, city's old and dangerous road overbridges got the much-needed attention, thanks to the COVID-19 lockdown. Central Railway and Western Railway turned the restriction on public's movement to its advantage by fixing the bridges along their respective lines.
While CR completed work on Byculla road bridge, National Highway bridge at Kasara and the busy road overbridge at Kopar, WR fixed a bridge crossing the lines at Dharavi and the one in Andheri is near-completion.


