28 March,2025 06:26 PM IST | Mumbai | mid-day online correspondent
Representational Image
The Central Railway has announced a temporary shutdown of the Mumbai Passenger Reservation System (PRS) for scheduled maintenance and disk defragmentation work. The system will be unavailable from 11:45 PM on March 29, 2025, to 3:45 AM on March 30, 2025.
During this period, several key services will remain unavailable, including:
ALSO READ
Central Railway workshop mourns engineer killed by terrorists in Pahalgam
CR announces summer special trains between LTT and Sultanpur, check details
Commuters sceptical of Badlapur rail fencing fix
Mumbai: Dismantling of Sion road overbridge begins; 7 old girders removed
Fencing done, work resumes at Badlapur island platform
Additionally, internet booking for Mumbai PRS trains will be suspended during this maintenance window. However, passengers can still avail of TDR (Ticket Deposit Receipt) refunds as per existing rules.
The Central Railway has urged passengers and rail users to plan their travel accordingly and bear with the temporary inconvenience caused by this essential maintenance work.