Mumbai Metro reaches eastern suburbs; first trial train coaches arrive at Anand Nagar

25 August,2025 12:29 PM IST |  Mumbai  |  Rajendra B. Aklekar

These are not the final trains, though the specifications remain identical, as the rolling stock (trains) contract for Mumbai Metro Green Line 4 and 4A was awarded

Trials are scheduled to begin in September 2025


Your browser doesn’t support HTML5 audio

Finally, trains are up. August 25 marked the beginning of Mumbai Metro activities in the eastern suburbs, with coaches of the first trial train being lifted up and placed on the tracks near Anand Nagar Thane since Monday midnight. Trials are set to begin in September 2025.

These will not be the actual trains, though the specifications are the same, as the rolling stock (trains) contract for Mumbai Metro Green Line 4 and 4A was awarded to a joint venture of Larsen & Toubro (L&T) and Alstom in February 2025.

A 10-station stretch from Gaimukh to Cadbury Junction (covering Line 4-A and part of Line 4) is expected to open by February 2026. This will be the longest among the partial launches; this 10.5-km stretch will include 10 stations.

The stations include Cadbury, Majiwada, Kapurbawadi, Manpada, Tikuji-ni-Wadi, Dongari Pada, Vijay Garden, Kasarvadavali, Gowaniwada, and Gaimukh. Gaimukh, Gowniwada, Kasarvadavali, Vijay Gardens, Dongripada (Hiranandani Estate), Tikujiniwadi, Manpada, Kapurbawdi Junction (Line 5), Majiwada, and Cadbury Junction.

"On August 25, midnight and morning, coaches of Yellow Line trains were lifted up and placed on the girders with heavy-duty cranes near Anand Nagar," an official said.

"Exciting news! Mid-day is now on WhatsApp Channels Subscribe today by clicking the link and stay updated with the latest news!" Click here!
mumbai metro mumbai trains mumbai thane mumbai news
Related Stories